What BPS Expansion Means for Your Buildings
November 13, 2026
Picture an energy manager six weeks out from a filing deadline, pulling a year of utility bills into a spreadsheet and hoping the numbers line up. That scene is playing out in more buildings every year, because “we should probably get more efficient” has turned into a deadline with someone’s name on it.
Building Performance Standards (BPS) keep spreading across U.S. cities, counties, and states (see IMT’s map for the latest list). California’s 2025 Title 24 code raised the electrification bar for anything built or renovated in the state. And New York’s all-electric mandate was upheld on appeal in 2026 after a long court fight.
Those three are only the leading edge, and nearly every other program building teams report to is asking for the same thing: proof.
What Does Building Performance Standards Compliance Mean for Your Buildings?
Building performance standards compliance means reporting each covered building’s energy use and emissions every year and proving it meets a target that tightens over time, or paying for the gap. Getting the data is the easy part. The hard part is a baseline and target that hold up when someone checks, and that’s where most teams get caught out.
By the Numbers
- 68 per metric ton of CO2e over the limit, every year, under New York City’s Local Law 97
- $4.8 billion in lifetime energy cost savings projected from California’s 2025 Title 24 code
- June 30, 2026: the Second Circuit upholds New York’s All-Electric Buildings Act
What Is Driving the Sudden Wave of Building Performance Mandates?
For a decade, cities relied on benchmarking: report your energy use, get a public score, and hope that was enough. It wasn’t, so they started attaching targets and fines to the same numbers. The National BPS Coalition, launched by the White House in 2022, brought state and local governments together to commit to building performance policy, and more have joined since.
What Does BPS Expansion Require From Building Owners?
The mechanics are similar across most BPS laws, even where the thresholds differ. Buildings above a square-footage cutoff (commonly 25,000 or 50,000 square feet) report energy use and emissions annually. Regulators set a performance target, usually an emissions-intensity limit that tightens on a multi-year schedule, typically stepping down through 2030 and again through 2040 or 2050. Owners who miss the target face fines that scale with excess energy use or emissions, and, in most jurisdictions, a mandatory corrective action plan. Several cities also publish the names of buildings that miss their targets.
In New York City, Local Law 97 fines run $268 for every metric ton of CO2e over the limit, every year. A building 500 tons over its limit would owe $134,000 a year. The owner is usually on the hook, even though most of the data sits with operators, tenants, or the utility.
Cities still writing their rules are watching the early adopters, and newer laws tend to reach smaller buildings and set tighter targets.
What Changed in California’s Title 24 Code?
California’s 2025 Title 24 cycle took effect January 1, 2026, for any permit filed on or after that date, and it moves electrification from encouraged to structural. Under the 2025 code, heat pumps are the starting point for heating and hot water in new homes and apartment buildings. You can still build with gas, but you have to make up the difference with better insulation, better equipment, or more solar. In most of the state, that costs more.
The commercial provisions go further. End-of-life rooftop unit replacements in retail, school, and office buildings must step up to high-efficiency systems, heat pumps included. Commercial kitchens and apartment buildings also have to be ready to go electric, even if they still run on gas. That means putting in the wiring paths and leaving enough room in the electrical panel to switch over later. The California Energy Commission projects $4.8 billion in statewide energy cost savings over the life of the code.
Title 24 only applies in California, but other states often copy California’s code. If you own buildings there, this is the minimum for new construction and major renovation.
What’s Coming in the Next Title 24 Cycle?
The 2025 cycle isn’t the last word. A draft CASE report submitted for the 2028 Title 24 cycle proposes requiring HVAC fault detection and diagnostics (FDD) in nonresidential buildings of 100,000 square feet or more, on large HVAC systems, meaning those rated above 300,000 Btu/hr, that serve more than three zones. It would apply to new construction, additions, and major HVAC replacements. As drafted, the system would have to catch five specific fault conditions: equipment running outside scheduled hours, leaking or inoperable coil valves, inoperable dampers, failed temperature sensors, and fans stuck at 100% or in manual override.
It was still a draft when we wrote this, and the details could change. If it passes as written, Title 24 would require FDD outright.
What Does New York’s All-Electric Buildings Act Require, and When Does It Take Effect?
New York’s All-Electric Buildings Act is a separate law from Title 24. Passed in 2023, it bans new gas, propane, and oil hookups in most new construction. Industry groups sued to block it, and the start date was put on hold while the case played out.
On June 30, 2026, the Second Circuit Court of Appeals upheld the law. Enforcement stays on hold until the legal challenge is fully resolved, so check with the New York Department of State for the current start date.
Once the law takes effect, Phase 1 covers new buildings seven stories or shorter, plus new commercial buildings under 100,000 square feet of conditioned floor area. Phase 2, set for January 1, 2029, expands the mandate to taller residential buildings and larger commercial space. Existing buildings aren’t affected. Owners can keep maintaining, repairing, and even replacing gas equipment in a building that’s already standing. Several categories are also exempt, including hospitals, restaurants, factories, and agricultural buildings.
If you have New York new construction or major renovations planned, build this into the design now.
Which Other Programs Ask for the Same Proof?
BPS, Title 24, and New York’s mandate get the headlines, but the landscape is wider than those three. Every program below is already live, and we know about each one because a client or partner brought it to us:
- NYSERDA reporting requirements in New York
- Seattle’s Building Emissions Performance Standard (BEPS), including its GHG-intensity (GHGI) targets and a separate energy display requirement
- Building Performance Colorado, the state’s benchmarking and performance standard program
- Massachusetts’ large building energy reporting requirements
- ISO 50001 and NABERS, the two standards multinational portfolios run into most often outside the U.S.
Each one wants the data in its own units and format, and the list keeps getting longer.
The Compliance Timeline
- 2022: The National BPS Coalition launches out of the White House, kicking off the current wave of city and state performance mandates.
- 2023: New York enacts the All-Electric Buildings Act, banning new gas, propane, and oil hookups in most new construction.
- January 1, 2026: California’s 2025 Title 24 cycle takes effect. It was also New York’s original all-electric start date, later stayed pending the court challenge.
- June 30, 2026: The Second Circuit Court of Appeals upholds New York’s All-Electric Buildings Act.
- 2028 (proposed): California’s next Title 24 cycle could add a mandatory FDD requirement for nonresidential buildings over 100,000 sq ft.
- January 1, 2029: Phase 2 of New York’s All-Electric Buildings Act is set to expand the mandate to taller buildings and large commercial space.
- 2030: The first major BPS emissions-intensity targets come due across many early BPS jurisdictions.
Who Feels This Most, Sector by Sector?
Every vertical Clockworks touches is running into some version of the same requirement:
- Higher education — a single campus with California assets hits Title 24 on every renovation permit, and campuses inside BPS cities have to report every building on that list against the same emissions-intensity target, using data that compares cleanly from one building to the next. See FDD for higher education
- Healthcare — multi-building hospital systems are the sharpest version of this problem. UPMC’s FDD program already spans 17 hospitals and 95 buildings across southwest Pennsylvania. That’s nearly 100 buildings, often under more than one reporting regime, all filing at once.
- K-12 — state benchmarking and large-building energy reporting laws, Massachusetts’ among them, increasingly reach school districts that were never built with compliance reporting in mind, on top of the deferred-maintenance backlog most districts are already managing. Read more on K-12
- Commercial and national portfolios — CFOs, sustainability leads, and VPs of Facilities need one number they can take to the board, even when their buildings sit in BPS cities, California, and New York at the same time. And they have to stand behind that number when ownership asks. Read the commercial real estate case study
- Government and public sector — public buildings are frequently the first movers under these laws, often facing shorter compliance timelines than private owners.
- Global portfolios — ISO 50001 and NABERS mean the baseline-and-target problem doesn’t stop at the U.S. border for multinational real estate teams.
What Do BPS, Title 24, and NY Electrification Have in Common?
A BPS filing wants annual energy and emissions data measured against a stated target. Title 24’s electric-ready provisions get inspected against as-built conditions. New York’s mandate will eventually need enforcement records showing which systems went in and when. None of them will accept “we think we’re doing fine.” They want a number for a specific building that holds up when someone checks it.
Until recently, most teams had nowhere structured to store a baseline or a target. Spreadsheets built from annual utility bills can’t hold an equipment-level trend, and they can’t anchor a baseline that still holds up three years later. It’s much easier to fix before a deadline than during one.
How Do You Prove Compliance When the Deadline Arrives?
This is where fault detection and diagnostics (FDD) helps, though it isn’t the whole answer. Clockworks Analytics monitors more than 630,000 pieces of equipment and 5.8 million data points across 4,300 buildings, and we’re building what compliance needs on top of that data. That means a side-by-side view of what each building should use and what it actually used, in energy, cost, carbon, and energy use per square foot (EUI). Every building is measured the same way, so the numbers line up across a whole portfolio. We also show where meter data is missing or unreliable, because that’s the first thing an auditor looks for.
No one can review 5.8 million data points by hand. Our AI models what each building should be using, based on its own history, and ranks each fault by what it costs. You can see the assumptions behind every result, and our engineers review the findings before they reach you.
The bigger piece is compliance reporting itself, built to serve every program listed above from the same foundation: the same savings, unit-conversion, and carbon-factor logic underneath, with every assumption visible on the page. That way you answer every program without rebuilding the work each time.
Not sure where your portfolio stands? Book a compliance readiness review. Our engineers will map which of your buildings are covered, flag gaps in your data, and help you set a baseline you can defend.
What Should You Do Before Your Next Filing?
You don’t need a new program to get ahead of this. Start with these four steps, well before your next deadline.
- Confirm which buildings are covered. Map every property against each jurisdiction’s size threshold and deadline, including state programs that sit on top of city ones.
- Pull 12 to 24 months of interval data. Utility bills tell you what happened; meter and equipment data tell you why. Find the gaps now, while there’s still time to fill them.
- Name your baseline year and write down why. Someone will ask, and “it’s what we had” won’t hold up.
- Fix the faults costing you the most. The fastest way to close the gap to a target is usually equipment running when it shouldn’t, or fighting itself when it does. Clockworks ranks every fault by what it costs in energy, dollars, and carbon, so you know where to start.
The work that satisfies a regulator is the same work that tells you how to run the portfolio. A building with a named baseline and live trend history can answer which systems are drifting, which capital projects actually paid off, and where the next dollar earns the most.
See Where Your Portfolio Stands Before the Deadline Does
One source of truth across every building you own.
Explore fault detection and diagnostics
Frequently Asked Questions
What is a Building Performance Standard (BPS)?
A Building Performance Standard is a local or state law that requires covered buildings to report energy use and emissions annually and meet a performance target that tightens over time, typically through 2030 and again through 2040 or 2050. Buildings that miss the target face fines and, in most jurisdictions, a required corrective action plan.
Which cities and states currently require BPS compliance?
Cities and counties with mandatory BPS include New York City (Local Law 97), Boston (BERDO), Denver, Seattle, Washington, D.C., Cambridge, St. Louis, Chula Vista, and Montgomery County, MD. Washington, Colorado, Maryland, and Oregon also have statewide standards, and more jurisdictions adopt them every year.
What does California’s Title 24 2025 update require?
Effective for permits filed on or after January 1, 2026, Title 24 makes heat pumps the baseline for space and water heating in new residential buildings and requires high-efficiency, heat-pump-ready rooftop replacements and electric-ready infrastructure in commercial buildings, including kitchens and multifamily properties.
Is California planning to require fault detection and diagnostics (FDD) directly?
A draft CASE report for the 2028 Title 24 cycle proposes requiring HVAC fault detection and diagnostics in nonresidential buildings of 100,000 square feet or more. It was still a draft when we wrote this, so check the California Energy Commission’s 2028 rulemaking for its current status.
When Does New York’s All-Electric Buildings Mandate Take Effect?
The Second Circuit Court of Appeals upheld the law on June 30, 2026. Enforcement begins once the legal challenge is fully resolved, starting with new buildings seven stories or shorter. Check with the New York Department of State for the current start date.
Does this apply to buildings outside BPS, Title 24, and New York?
Yes. NYSERDA reporting in New York, Seattle’s BEPS (including its GHG-intensity targets and energy display requirement), Building Performance Colorado, Massachusetts’ large building energy reporting requirements, and international standards like ISO 50001 and NABERS all ask for the same kind of performance data, just in different units, boundaries, and formats.
What happens if a building doesn’t meet its BPS target?
Consequences vary by city but typically include fines that scale with excess energy use or emissions, a mandatory corrective action plan, and, in several jurisdictions, inclusion on a public non-compliance list. In New York City, Local Law 97 fines run $268 per metric ton of CO2e over the limit.
How does fault detection and diagnostics (FDD) help prove compliance?
FDD continuously monitors equipment and catches faults and drift as they happen, not once a year at benchmarking time. Paired with a clear baseline and target, that record gives a BPS filing, Title 24 inspection, or enforcement review something solid to check, instead of a year reconstructed from utility bills.